51564 Poor illumination of dials on Class 314s

April 2013 in Train Operations

tagged Equipment Rolling stock Scotland

Concerns have been raised about the illumination of the speedometer and brake gauge dials on Class 314s.

Continue reading this article »

51454 Lack of heating at West Hampstead Thameslink station

April 2013 in Train Operations

tagged Station and platform Work environment Equipment South East

Concerns have been raised about the lack of heating at West Hampstead Thameslink station.

Continue reading this article »

51576 ‘Lone working’ at Chesterfield station

April 2013 in Train Operations

tagged Fatigue Method of working Workload North West

Concerns have been raised about staff lone working at Chesterfield station and the effect this could have on fatigue management and personal safety.

Continue reading this article »

51713 ‘Off train’ safety briefs not being delivered on schedule

April 2013 in Train Operations

tagged Communication and teamwork Knowledge Skills and experience Training and briefing North West

A reporter is concerned that the 'off train' safety briefings given to Conductors in the Manchester area are not being delivered to schedule.

Continue reading this article »

51562 Lack of lighting at Tees Marshalling yard

April 2013 in Freight Operations

tagged Equipment Work environment North East

A reporter is concerned about the lack of lighting in the Up arrival and Down staging areas at Tees Marshalling yard.

Continue reading this article »

51600 Clarification required on procedures at Teesside steel works

April 2013 in Freight Operations

tagged Method of working Rules and procedures Training and briefing North East

Clarification is sought on the correct procedures that should be followed when propelling wagons at Teesside steel works. It has been noted that various methods are being used when propelling rigs of nine and fifteen wagons.

Continue reading this article »

51638 Groundstaff not used at Cliffe Hill quarry

April 2013 in Freight Operations

tagged Method of working Rules and procedures West Midlands

It has been brought to a reporter's attention that GB Railfreight are asking their Drivers at Stud Farm sidings in Cliffe Hill quarry to undertake train duties alone.

Continue reading this article »

51643 Infrastructure staff working excessive hours

April 2013 in Freight Operations

tagged Fatigue Rostering Rules and procedures South East South West West Midlands East Midlands

A reporter is concerned about excessive hours being worked by staff for the infrastructure side of DB Schenker in the south and Midlands.

Continue reading this article »

51622 GSM-R requirements for Drivers not met in Lincolnshire

April 2013 in Freight Operations

tagged Communication and teamwork Method of working Training and briefing East Midlands

A reporter is concerned that some freight Train Drivers have not adjusted to the new requirements for GSM-R and are not registering their trains when entering service in Lincolnshire.

Continue reading this article »

51685 Authorised walking route at Eastleigh obstructed

April 2013 in Freight Operations

tagged Infrastructure South East

Concerns have been raised about the authorised walking route from Eastleigh depot to the station being obstructed.