51397 Dirty speed boards between Redhill and Balcomb junction

January 2013 in Network Rail and Suppliers

tagged Equipment Signalling South East

A reporter is concerned that there are several dirty, difficult to see permanent speed and warning boards between Redhill and Balcomb junction.

Continue reading this article »

51003 Static problems affecting workstations at York

November 2012 in Network Rail and Suppliers

tagged Equipment Signalling Work environment South East North West North East

The introduction of new chairs and flooring at York Integrated Electronic Control Centre (IECC) about a year ago has created a problem with static

Continue reading this article »

51094 Remote control technology for machines questioned.

November 2012 in Network Rail and Suppliers

tagged Equipment South East

A reporter is concerned about the potential safety consequences of the industrdopting new remote control technology for machines used on the railway.

Continue reading this article »

51216 OFF indicator on platform ten at Euston not working

October 2012 in Network Rail and Suppliers

tagged Equipment Station and platform Work environment South East

A reporter is concerned that one of the OFF indicators on platform 10 at Euston has not been working for two months. There are two OFF indicators on this platform to aid dispatch because the platform is curved.

Continue reading this article »

50312 Various site issues on the Evergreen Project

July 2012 in Network Rail and Suppliers

tagged Rostering Rules and procedures Work environment Equipment South East

A reporter is concerned by a number of safety issues arising on sites managed by BAM Nuttall for the Evergreen Project.

Continue reading this article »

50663 Insufficient lighting at Eastleigh yard

May 2012 in Network Rail and Suppliers

tagged Equipment Work environment South East

A reporter has two concerns about the lighting at Eastleigh yard.

Continue reading this article »

50328 Poorly lit semaphore signals at Cocklebury

February 2012 in Network Rail and Suppliers

tagged Equipment Signalling South East

A Driver would like to report six poorly illuminated semaphore signals on the Up and Down lines at Cocklebury, near Neasden. This line is only used by freight trains.

 

Continue reading this article »

50331 Lack of working bardic lamps and radios at Gatwick station

February 2012 in Network Rail and Suppliers

tagged Equipment Signalling South East

A reporter has expressed concerns about the lack of fully functioning bardic lamps and radios available to Train Dispatchers working for Network Rail at Gatwick station.

 

Continue reading this article »

50117, 50134, 50035, 50139 Train dispatch monitors posing risk

May 2011 in Network Rail and Suppliers

tagged Equipment South East

Four Drivers, reporting to CIRAS independently, are concerned that train dispatch monitors at Southeastern stations pose a safety risk.

Continue reading this article »

41208 Faults at Wembley Main Line signalling control centre

February 2011 in Network Rail and Suppliers

tagged Signalling Equipment South East

Signallers at Wembley Main Line signalling control centre have raised concerns about Signal Post Telephones (SPTs) and lighting not working.

Continue reading this article »