
November 2012 in Network Rail and Suppliers
Equipment
Signalling
Work environment
South East
North West
North East
November 2012 in Network Rail and Suppliers
Infrastructure
Work environment
South East
October 2012 in Network Rail and Suppliers
Equipment
Station and platform
Work environment
South East
A reporter is concerned that one of the OFF indicators on platform 10 at Euston has not been working for two months. There are two OFF indicators on this platform to aid dispatch because the platform is curved.
July 2012 in Network Rail and Suppliers
Rostering
Rules and procedures
Work environment
Equipment
South East
May 2012 in Network Rail and Suppliers
Equipment
Work environment
South East
A reporter has two concerns about the lighting at Eastleigh yard.
April 2011 in Network Rail and Suppliers
The risk of receiving an electric shock from the wires on the supporting fixtures of the Overhead Line Equipment (OLE), located next to the flyover on the Down Tilbury Line, concerns one reporter.
January 2011 in Network Rail and Suppliers
Equipment
Work environment
South East
A reporter has contacted CIRAS with numerous concerns about the new Class 378 units operating on the London Overground network.
December 2010 in Network Rail and Suppliers
Station and platform
Work environment
South East
The build up of diesel fumes on the Eurostar platforms at St Pancras station is causing concern for one reporter.
November 2010 in Network Rail and Suppliers
Station and platform
Work environment
South East
The site of the new station at Dalston for the East London Line Project poses several safety risks, according to one reporter.
November 2010 in Network Rail and Suppliers
Method of working
Work environment
South East
A reporter raises concerns about several unsafe practices occurring during refurbishment works at Sutton station by Metropex staff who are currently contracted by YJLi.