Download a CIRAS report form
  • Freephone: 0800 4 101 101
  • Text us on: 07507 285 887
  • Freepost: Freepost CIRAS
  • Call me back
A safety net when all else fails

50906 ‘Industry-wide problem’ for subcontractor travel times

November 2012 in Network Rail and Suppliers

tagged Fatigue Rules and procedures Rostering Not Specified

A reporter is concerned that long travel times for subcontractors exceed acceptable levels at many different companies.

Continue reading this article »

50979 Long hours and excessive consecutive shifts

November 2012 in Network Rail and Suppliers

tagged Fatigue Rostering Rules and procedures Workload Not Specified

Concerns have been raised about staff working excessive hours made up of long, consecutive and back-to-back shifts

Continue reading this article »

50790 Staff working excessive hours and consecutive shifts

November 2012 in Network Rail and Suppliers

tagged Fatigue Rostering Rules and procedures Not Specified

A reporter has two concerns about staff working in the rail infrastructure division of C Spencer Ltd.

Continue reading this article »

51083 Long travel times for Trainers causes fatigue

November 2012 in Network Rail and Suppliers

tagged Rostering Rules and procedures Not Specified

A reporter is concerned that Network Rail Trainers are travelling long distances by car to attend their training sessions around the country.

Continue reading this article »

50903 Clarification on consecutive 14 hour door-to-door shifts

November 2012 in Network Rail and Suppliers

tagged Fatigue Rostering Rules and procedures Not Specified

Clarification is required on the rest period to be received by staff when working consecutive shifts with a door-to-door time of 14 hours.

Continue reading this article »

50020 Fatigue created by lack of rest days

May 2012 in Network Rail and Suppliers

tagged Fatigue Rostering Rules and procedures Not Specified

Concerns have been raised about staff working for McGinley Infrastructure exceeding the 14 hour door-to-door recommendation and not being provided with adequate rest days.

Continue reading this article »

50426 Fatigue caused by exceeding the 14 hour recommendation

May 2012 in Network Rail and Suppliers

tagged Fatigue Rostering Rules and procedures Not Specified

Concerns have been raised about staff exceeding the 14 hour door-to-door recommendation

Continue reading this article »

41205 Staff attending training courses between shifts

February 2011 in Network Rail and Suppliers

tagged Rostering Training and briefing Fatigue Not Specified

Staff attending training courses in the evening between working shifts, concerns one reporter.

Continue reading this article »

41108 Clarification sought over working practices

January 2011 in Network Rail and Suppliers

tagged Fatigue Rostering Method of working Not Specified

The reporter is seeking clarification on several issues which include the disruption of sleep patterns, practices involving re-laying and lifting heavy rails and the calibration of equipment.

Continue reading this article »

41027 Signal boxes and automatic half barrier crossings not being staffed at night

January 2011 in Network Rail and Suppliers

tagged Signalling Rostering Not Specified

A reporter has contacted CIRAS with concerns about automatic half barrier crossings and signal boxes not being staffed at night during engineering works.

Continue reading this article »

older Articles

Categories

  • Network Rail and suppliers close

Themes

  • Rostering close

Locations

  • Not Specified close