Report your concern online
A safety net when all else fails

53365 Size and brightness of LED signals

February 2015 in Network Rail and Suppliers

tagged Equipment Rules and procedures Signalling Work environment West Midlands

A reporter is concerned about the brightness and size of the new LED signals across the network.

Continue reading this article »

52683 Increase in pre-planned un-signalled moves

October 2014 in Network Rail and Suppliers

tagged Method of working Signalling Workload North East

Concerns have been raised about the increase of pre-planned un-signalled
moves at Mexborough.

Continue reading this article »

53126 Signal SK6554 obscured by overgrown vegetation

October 2014 in Network Rail and Suppliers

tagged Equipment Infrastructure Signalling Scotland

A reporter has raised concerns that signal SK6554 on the Kincardine to Sterling route is completely obscured by trees.

Continue reading this article »

52488 Concern over time taken to repair broken semaphore signal

June 2014 in Network Rail and Suppliers

tagged Equipment Rules and procedures Signalling North East

Concern has been expressed over the amount of time taken to repair the distant semaphore signal located on the Up line at Bellwater junction between Skegness and Boston. 

Continue reading this article »

52795 Speed restrictions set up incorrectly

April 2014 in Network Rail and Suppliers

tagged Equipment Signalling Rules and procedures South East Central North East

Concern has been expressed that Temporary Speed Restrictions (TSRs) and Emergency Speed
Restrictions (ESRs) are not being set up correctly on the route between Sheffield and London.

Continue reading this article »

52508 AWS code 2 fault at signal DY1 not rectified

March 2014 in Network Rail and Suppliers

tagged Equipment Infrastructure Signalling West Midlands

Concern has been expressed that signal DY1, located at Elford, has not been fixed even though it is incorrectly producing an Automatic Warning System (AWS) code 2 fault.

Continue reading this article »

51251 Inconsistencies carrying out signal box special instructions

January 2014 in Network Rail and Suppliers

tagged Communication and teamwork Method of working Level Crossings Signalling West Midlands

Following report 41076 Signal Box Special Instructions (SBSIs) were brought in at Gobowen level crossing due to the poor rail adhesion and falling gradient on the approach to the station. 

Continue reading this article »

52344 No radio communication between Taynuilt and Oban

January 2014 in Network Rail and Suppliers

tagged Communication and teamwork Equipment Infrastructure Signalling Scotland

Concern has been expressed that between Taynuilt and Oban on the West Highland line there is no means of communication between the Driver and Signaller, due to inference from the user mast.

Continue reading this article »

52222 Obscured signal at Haymarket station

December 2013 in Network Rail and Suppliers

tagged Method of working Rules and procedures Signalling Station and platform Scotland

Concerns have been raised about a shelter on platform four at Haymarket station obstructing the Conductors' view of the signal and Route Indicator (RI).

Continue reading this article »

51655 Misleading ground signals at Workington station

September 2013 in Network Rail and Suppliers

tagged Infrastructure Signalling North West

A reporter has concerns about obsolete ground signals in the Workington station area causing confusion for Drivers.

Continue reading this article »

older Articles