53632 Unclear monitors at Putney Bridge station

July 2015 in London Underground

tagged Equipment Method of working Station and platform South East

A reporter has raised concerns about unclear monitors on the westbound platform at Putney Bridge station.

Continue reading this article »

53554 Management of door obstructions

July 2015 in London Underground

tagged Communication and teamwork Method of working Rules and procedures Station and platform South East

A reporter is concerned about how London Underground are managing the behaviour of passengers in relation to door obstructions.

Continue reading this article »

53492 and 53493 Rail masters not checked adequately

June 2015 in London Underground

tagged Equipment Method of working Rules and procedures Training and briefing South East

Several reporters have raised concerns about inadequate checks carried out on rail masters.

Continue reading this article »

53390 Unsafe practices relating to asset inspections

May 2015 in London Underground

tagged Infrastructure Method of working Rules and procedures Supervision and Management South East

A reporter is concerned about asset inspections being carried out without the correct equipment or method statements.

Continue reading this article »

53352 Drivers unable to see the full length of the train

April 2015 in Train Operations

tagged Communication and teamwork Method of working Station and platform South East

A reporter is concerned about not being able to see the full length of the train when departing in the Up direction from Romford, Chadwell Heath and Seven Kings stations during the weekday morning peak hours.

Continue reading this article »

53348 Site access management at Willesden junction

March 2015 in Network Rail and Suppliers

tagged Rules and procedures Method of working Supervision and Management South East

A reporter is concerned about the site access management at Willesden junction. It is reported that site access is being poorly managed and proper checks are not being carried out before staff are allowed on site.

Continue reading this article »

53318 Management of staff health and wellbeing

March 2015 in Train Operations

tagged Fatigue Method of working Workload South East

A reporter is concerned about the management and reporting of staff health issues at Ramsgate depot.

Continue reading this article »

53098 Staff entering a live section of track without protection

January 2015 in London Underground

tagged Method of working Rules and procedures South East

A reporter has raised concerns about staff putting themselves at risk by walking onto a live section of track on a site at Roxborough bridge.

Continue reading this article »

53139 Unclear policy on PPE for staff at Bedford carriage sidings

January 2015 in Train Operations

tagged Equipment Method of working Rules and procedures South East

A reporter has raised concerns about the policy detailing what Personal Protective Equipment (PPE) should be worn by staff working at Bedford carriage sidings.

Continue reading this article »

53210 Overloading of vehicles at Lillie Bridge depot

December 2014 in London Underground

tagged Equipment Method of working Rules and procedures South East

A reporter has raised concerns that vehicles transporting loads from Lillie Bridge depot may be overloaded.

Continue reading this article »