Download a CIRAS report form
  • Freephone: 0800 4 101 101
  • Text us on: 07507 285 887
  • Freepost: Freepost CIRAS
  • Call me back
A safety net when all else fails

51567 Inadequate PNBs at Thames Valley signalling centre

March 2013 in Network Rail and Suppliers

tagged Fatigue Method of working Rostering Central

Concerns have been raised about staff at Thames Valley Signalling Centre (TVSC) not receiving adequate personal needs breaks (PNBs).

Continue reading this article »

50554 Staff exceeding 14 hour door-to-door recommendation

May 2012 in Network Rail and Suppliers

tagged Fatigue Rules and procedures Central

A reporter is concerned that Stobart Rail staff on the Bletchley remodelling project are exceeding the Network Rail 14 hour door-to-door recommendation.

Continue reading this article »

50467 Travel times exceeding 14 hour door-to-door recommendation

February 2012 in Network Rail and Suppliers

tagged Fatigue Rules and procedures Central

Concerns have been raised about the travel times for staff working on the Water Orton project near Birmingham.

Continue reading this article »

40660 Length of turns and PNBs

November 2009 in Freight Operations

tagged Fatigue Rostering Central West Midlands East Midlands

A reporter would like to highlight two concerns regarding the shift design for certain turns and the facilities on offer during personal needs breaks (PNBs).

Continue reading this article »

40681 Change in shift patterns at Gloucester Road signal box

August 2009 in Network Rail and Suppliers

tagged Rostering Fatigue South West Central

A reporter is concerned about the changes in shift patterns, particularly on Sundays, affecting signaller‟s workload and fatigue levels at Gloucester Road signal box.

Continue reading this article »