Download a CIRAS report form
  • Freephone: 0800 4 101 101
  • Text us on: 07507 285 887
  • Freepost: Freepost CIRAS
  • Call me back
A safety net when all else fails

51260 New signalling system in Greater Anglia

December 2012 in Network Rail and Suppliers

tagged Signalling Method of working Level Crossings East Anglia

A reporter is concerned that the introduction of the new signalling system in Greater Anglia will result in level crossing users having to wait longer before being given permission to cross by the Signaller. This could lead to users making high risk decisions to cross without confirmation that it is safe to do so.

Continue reading this article »

50995 RIMINI packs in Anglia contain ‘low quality information’

September 2012 in Network Rail and Suppliers

tagged Method of working Rules and procedures East Anglia

A reporter is concerned that RIMINI packs in the Anglia region frequently contain inaccuracies.

Continue reading this article »

40806 Faults reported in repair books

March 2010 in Train Operations

tagged Method of working Equipment Communication and teamwork Work environment East Anglia East Midlands

Maintenance issues raised in National Express East Coast (NXEC) repair books are of concern to a reporter.

Continue reading this article »

40659 Drivers unaware of possible changes in procedures about HST brake isolations

March 2010 in Train Operations

tagged Equipment Method of working Rules and procedures Communication and teamwork East Midlands East Anglia

Concern has been raised about axle isolations on High Speed Trains (HSTs).

Continue reading this article »

40821 Condition, positioning and use of speed restriction boards

March 2010 in Network Rail and Suppliers

tagged Infrastructure Equipment Method of working East Anglia Central

A reporter has contacted CIRAS with concerns about the condition and positioning of temporary speed restriction (TSR) boards and the use of limited clearance speed restriction boards throughout the Ipswich and Felixstowe areas.

Continue reading this article »

40792 MOMs not given training to cover new area

January 2010 in Network Rail and Suppliers

tagged Rules and procedures Training and briefing Method of working Supervision and Management South East East Anglia

A reporter is concerned that mobile operations managers (MOMs) at Harlow have not been given training after they were recently asked to cover Cambridge and Tottenham on Sundays.

Continue reading this article »

40739 On board trolleys

August 2009 in Train Operations

tagged Method of working Equipment South East South West Central North West East Midlands West Midlands East Anglia

Concern has been raised about the design and use of on-board trolleys that provide passengers with hot and cold drinks and cold food on the Voyager trains and HSTs across almost all Cross Country routes.

Continue reading this article »

40725 Lack of clear instructions in Beckingham signal box

August 2009 in Network Rail and Suppliers

tagged Signalling Method of working Equipment Training and briefing Level Crossings Infrastructure East Midlands East Anglia

A reporter is concerned that the instructions in Beckingham signal box were not changed after emergency regulation was re-introduced about six months ago.

Continue reading this article »

40640 Out of date caution still being issued

June 2009 in Network Rail and Suppliers

tagged Rules and procedures Method of working East Anglia

A reporter is concerned that a caution for drivers on the East Suffolk line was not retracted when it was no longer relevant.

Continue reading this article »