Download a CIRAS report form
  • Freephone: 0800 4 101 101
  • Text us on: 07507 285 887
  • Freepost: Freepost CIRAS
  • Call me back
A safety net when all else fails

51682 Clarification for drugs and alcohol testing rules

March 2013 in Train Operations

tagged Rules and procedures Not Specified

A reporter is asking for clarification on the correct procedure to follow when a safety critical member of staff is relieved of their duties in circumstances which require a drugs and alcohol test.

Continue reading this article »

51686 Clarification on TOC personal track safety competencies

March 2013 in Train Operations

tagged Rules and procedures Training and briefing Not Specified

A reporter is seeking clarification on additional competencies covered by Train Operating Companies Personal Track Safety (TOC PTS).

Continue reading this article »

51268 ‘Inadequate’ rest period during shift rotation

February 2013 in Network Rail and Suppliers

tagged Fatigue Rules and procedures Not Specified

A reporter is concerned about the rest periods received by Driver Operators when rotating from night to day shifts.

Continue reading this article »

51317 ‘Unworkable’ train schedules increasing Signallers’ workload

February 2013 in Network Rail and Suppliers

tagged Communication and teamwork Method of working Workload Not Specified

Concerns have been raised that trains are being scheduled into the working timetable without being validated, potentially increasing the workload for Signallers.

Continue reading this article »

51365 Staff covering roles when ‘not fully competent’

February 2013 in Network Rail and Suppliers

tagged Knowledge Skills and experience Method of working Training and briefing Not Specified

A reporter is concerned that Mobile Operation Managers (MOMs) are being asked to cover for the Shift Signalling Managers (SSMs) in signal boxes, without the required knowledge of the rules and regulations.

Continue reading this article »

51457 Fatigued workers exceeding 14 hours door-to-door

February 2013 in Network Rail and Suppliers

tagged Fatigue Rules and procedures Supervision and Management Not Specified

A reporter is concerned about the rostering and travel times of Colas staff doing track renewal work in the western region. The reporter states the Network Rail 14 hour door-to-door recommendation is regularly being exceeded and staff are often doing 15 or 16 hours door-to-door.

Continue reading this article »

51427 Clarification required on giving line blockages

February 2013 in Network Rail and Suppliers

tagged Method of working Rules and procedures Not Specified

A reporter is seeking clarification on whether a line blockage can be given if a train is in the section of track where the line blockage is required.

Continue reading this article »

50226 Bicycles on board Pendolino and Voyager trains

January 2013 in Train Operations

tagged Rolling stock Rules and procedures Not Specified

A reporter has two concerns about the reservation and storage of bicycles on board Pendolino and Voyager trains.

Continue reading this article »

50294 Safety communication between Train Managers and Drivers

January 2013 in Train Operations

tagged Rolling stock Communication and teamwork Supervision and Management Not Specified

A Driver has concerns about how safety information is being communicated by Train Managers (TM) on Pendolino units, with face-to-face communication becoming less common.

Continue reading this article »

50310 Ticket checks with only one door open

January 2013 in Train Operations

tagged Method of working Security Not Specified

A reporter has concerns about how passenger tickets are currently being checked by Train Managers (TM) and the British Transport Police (BTP).

Continue reading this article »

older Articles