Download a CIRAS report form
  • Freephone: 0800 4 101 101
  • Text us on: 07507 285 887
  • Freepost: Freepost CIRAS
  • Call me back
A safety net when all else fails

50260 Concern over the length of time taken to contact Control

August 2012 in Freight Operations

tagged Communication and teamwork Rules and procedures Not Specified

 A Driver is concerned about the length of time it takes to get through via telephone to Direct Rail Services Control.  Drivers contact Control to inform them of train movements, incidents on the line, the punctuality of trains, and any other problems.

Continue reading this article »

40802 PTS assessment procedure not being followed

November 2009 in Freight Operations

tagged Training and briefing Method of working Communication and teamwork Knowledge Skills and experience Not Specified

A reporter is concerned about PTS assessments procedure at DB Schenker.

Continue reading this article »

40632 Sectional appendices missing or out of date

August 2009 in Freight Operations

tagged Training and briefing Method of working Communication and teamwork Not Specified

A reporter is concerned that there do not seem to be enough sectional appendices available to DB Schenker drivers.

Continue reading this article »

Categories

  • Freight Operations close

Themes

  • Communication and teamwork close

Locations

  • Not Specified close