September 2012 in Network Rail and Suppliers
Rules and procedures
Method of working
Infrastructure
Not Specified
July 2012 in Train Operations
Equipment
Infrastructure
Method of working
Not Specified
February 2011 in Network Rail and Suppliers
Equipment
Infrastructure
Not Specified
A reporter is concerned about the lapse in maintenance of trackside plant and equipment since the contract was taken over by Torrent Trackside late last year.
August 2010 in Network Rail and Suppliers
Rules and procedures
Infrastructure
Equipment
Not Specified
A reporter is concerned about Network Rail's new policy to reduce ultrasonic testing foot patrols which follows initial checks by the ultrasonic train.
August 2010 in Network Rail and Suppliers
Rules and procedures
Infrastructure
Equipment
Not Specified
A concern has been raised that safety devices used to restrict the weight that can be lifted by Road Rail Vehicles (RRVs) are often disabled creating the potential for them to topple over.
May 2010 in Network Rail and Suppliers
Method of working
Infrastructure
Not Specified
A track worker is concerned about what appear to be unauthorised alterations made to RIMINI packs on site.