52594 Lack of practical experience for red zone working

April 2015 in Network Rail and Suppliers

tagged Knowledge Skills and experience Rules and procedures Training and briefing Not Specified

Concern has been expressed that newly qualified staff lack practical experience in red zone
working.

Continue reading this article »

53422 Safety harnesses not being inspected

March 2015 in Network Rail and Suppliers

tagged Equipment Rules and procedures Not Specified

A reporter is concerned about safety harnesses not being inspected regularly and test certificates not being carried by staff working on Mobile Elevated Work Platforms (MEWPs).

Continue reading this article »

53099 Excessive door-to-door times

November 2014 in Network Rail and Suppliers

tagged Fatigue Rostering Rules and procedures Supervision and Management Not Specified

A reporter has raised concerns that accommodation is not always booked for staff when travelling long distances between their home and a work site, resulting in excessive door-to-door times.

Continue reading this article »

53000 Maintenance Staff booking on by text message

October 2014 in Network Rail and Suppliers

tagged Communication and teamwork Rules and procedures Supervision and Management Not Specified

Concerns have been raised about Maintenance Staff booking on by text message instead of by telephone.

Continue reading this article »

52518 Clarification on duties and size of work groups

July 2014 in Network Rail and Suppliers

tagged Communication and teamwork Method of working Rules and procedures Workload Not Specified

Clarification is being sought on a number of issues surrounding staff undertaking the roles of
Engineering Supervisor (ES) and Controller of Site Safety (COSS). These are issues for both Network Rail and contractor managed work sites.

Continue reading this article »

52868 Perceived lack of safety information and equipment

July 2014 in Network Rail and Suppliers

tagged Equipment Method of working Rules and procedures Not Specified

Concerns have been raised about a perceived lack of safety information and equipment in relation to the compilation of Safe System of Work (SSoW) packs and the carrying of
detonators.

Continue reading this article »

52953 Staff not briefed on changes to the COSS role

July 2014 in Network Rail and Suppliers

tagged Knowledge Skills and experience Method of working Rules and procedures Training and briefing Not Specified

Concerns have been raised that although changes to the Controller Of Site Safety (COSS) role are due to be implemented later this year, staff have not been given details of the changes.

Continue reading this article »

52706 Security staff working without personal protective equipment

June 2014 in Network Rail and Suppliers

tagged Equipment Rules and procedures Not Specified

Concerns have been raised that Security Staff contracted through Land Sheriff are working on and about the track without wearing full orange Personal Protective Equipment (PPE)
or hard hats.

Continue reading this article »

52526 Clarification on the use of the log grab lifting attachment

March 2014 in Network Rail and Suppliers

tagged Method of working Rules and procedures Not Specified

Clarification is being sought under what circumstances a log grab lifting attachment can be used to move scrap rail.

Continue reading this article »

52715 Clarification on use of Lookouts when working near a tunnel

March 2014 in Network Rail and Suppliers

tagged Communication and teamwork Method of working Rules and procedures Not Specified

Clarification is being sought on the use of distant Lookouts on work sites when working in or near tunnels.



 

Continue reading this article »

older Articles

Categories

  • Network Rail and suppliers close

Themes

  • Rules and procedures close

Locations

  • Not Specified close

Rail Safety Summit 2015

Royal College of Physicians, London

30/04/2015 - 01/05/2015