Download a CIRAS report form
  • Freephone: 0800 4 101 101
  • Text us on: 07507 285 887
  • Freepost: Freepost CIRAS
  • Call me back
A safety net when all else fails

51317 ‘Unworkable’ train schedules increasing Signallers’ workload

February 2013 in Network Rail and Suppliers

tagged Communication and teamwork Method of working Workload Not Specified

Concerns have been raised that trains are being scheduled into the working timetable without being validated, potentially increasing the workload for Signallers.

Continue reading this article »

51365 Staff covering roles when ‘not fully competent’

February 2013 in Network Rail and Suppliers

tagged Knowledge Skills and experience Method of working Training and briefing Not Specified

A reporter is concerned that Mobile Operation Managers (MOMs) are being asked to cover for the Shift Signalling Managers (SSMs) in signal boxes, without the required knowledge of the rules and regulations.

Continue reading this article »

51427 Clarification required on giving line blockages

February 2013 in Network Rail and Suppliers

tagged Method of working Rules and procedures Not Specified

A reporter is seeking clarification on whether a line blockage can be given if a train is in the section of track where the line blockage is required.

Continue reading this article »

50310 Ticket checks with only one door open

January 2013 in Train Operations

tagged Method of working Security Not Specified

A reporter has concerns about how passenger tickets are currently being checked by Train Managers (TM) and the British Transport Police (BTP).

Continue reading this article »

51326 Emergency lighting in the Class 170s ‘insufficient’

December 2012 in Train Operations

tagged Rolling stock Method of working Work environment Not Specified

A reporter is concerned that when the Class 170s are powered down at terminal stations the emergency lighting that comes on in the coaches is not adequate enough for passengers alighting from the train.

Continue reading this article »

51010 & 51048 Train cleaning procedures near overhead lines

November 2012 in Train Operations

tagged Knowledge Skills and experience Method of working Training and briefing Not Specified

Staff working for ISS Facility Services would like clarification on the procedures for cleaning trains in Siemens depots.

Continue reading this article »

50224 Placing ‘Not To Be Moved’ boards on trains

November 2012 in Train Operations

tagged Method of working Rules and procedures Not Specified

A reporter is concerned about 'Not To Be Moved' (NTBM) boards not being placed on Voyager 221s whilst maintenance work is being carried out at stations.

Continue reading this article »

50830 Foundations for overhead line electrification work

September 2012 in Network Rail and Suppliers

tagged Rules and procedures Method of working Infrastructure Not Specified

A reporter is concerned by the current management of Overhead Line Electrification (OLE) foundations work

Continue reading this article »

50709 Electrical switch gear ‘not fully tested’ at major stations

July 2012 in Train Operations

tagged Equipment Infrastructure Method of working Not Specified

A reporter is concerned that the electrical switchgear used to control power at all major stations managed by First Great Western is not being fully tested.

Continue reading this article »

50741 Clarification for placing Not To Be Moved boards on units

July 2012 in Train Operations

tagged Method of working Security Not Specified

A concern has been raised about First Capital Connect's (FCC) revised procedure for placing Not To Be Moved (NTBM) boards on trains when they are stationary in a yard

Continue reading this article »

older Articles