Download a CIRAS report form
  • Freephone: 0800 4 101 101
  • Text us on: 07507 285 887
  • Freepost: Freepost CIRAS
  • Call me back
A safety net when all else fails

51685 Authorised walking route at Eastleigh obstructed

April 2013 in Freight Operations

tagged Infrastructure South East

Concerns have been raised about the authorised walking route from Eastleigh depot to the station being obstructed.

Continue reading this article »

51498 Defective pit lamps at Bank station

March 2013 in London Underground

tagged Equipment Infrastructure Station and platform South East

Concerns have been raised about defective pit lamps on both the eastbound and westbound platforms of the Central line at Bank station.

Continue reading this article »

51500 Broken cable bar clips between Mile End and Stratford

March 2013 in London Underground

tagged Equipment Infrastructure South East

Concerns have been raised about broken cable bar clips in the eastbound direction between Mile End and Stratford.

Continue reading this article »

51551 Unmarked speed restriction between Carnforth and Settle

March 2013 in Network Rail and Suppliers

tagged Equipment Infrastructure Signalling North East Scotland

A reporter has concerns about an emergency speed restriction between Carnforth station junction and Settle junction which was left unmarked for two days.

Continue reading this article »

51188 Passengers trespassing at Basildon station

February 2013 in Network Rail and Suppliers

tagged Station and platform Infrastructure Security South East


Concerns have been raised about passengers, particularly youths, trespassing at Basildon station in order to evade fares. This is being witnessed on a daily basis, by both staff and other passengers.

Continue reading this article »

51327 'Rough ride’ at Trent East junction and Meadow Lane

December 2012 in Network Rail and Suppliers

tagged Infrastructure Work environment East Midlands

Concern has been expressed that staff are experiencing a 'rough ride' when the trains travel over the new points work at Trent East junction and the old point work at the end of the old Down goods loop at Meadow Lane level crossing.

Continue reading this article »

51082 Persistent vegetation issue at Westbury yard

November 2012 in Network Rail and Suppliers

tagged Infrastructure Work environment South East

A reporter is concerned by Slip, Trip and Fall (STF) hazards posed by vegetation at Westbury yard, Wiltshire

Continue reading this article »

51036 Passengers trespassing at Pitsea station

November 2012 in Network Rail and Suppliers

tagged Infrastructure Level Crossings Station and platform Security South East

A reporter has witnessed incidents of passengers, especially youths, trespassing at Pitsea station on a daily basis to avoid paying their fare.

Continue reading this article »

51113 Rubbish piles creating lineside hazard

November 2012 in Network Rail and Suppliers

tagged Infrastructure Security South East

A reporter is concerned about rubbish mounds, up to 30 feet tall, next to the running line between West Ruislip and Denham.

Continue reading this article »

51153 Children trespassing at West St. Leonards

November 2012 in Network Rail and Suppliers

tagged Infrastructure Security South East

A reporter has raised concerns that children are trespassing at West St. Leonards by climbing underneath an access gate.

Continue reading this article »

older Articles