
April 2013 in Freight Operations
Concerns have been raised about the authorised walking route from Eastleigh depot to the station being obstructed.
March 2013 in London Underground
Equipment
Infrastructure
Station and platform
South East
Concerns have been raised about defective pit lamps on both the eastbound and westbound platforms of the Central line at Bank station.
March 2013 in London Underground
Equipment
Infrastructure
South East
Concerns have been raised about broken cable bar clips in the eastbound direction between Mile End and Stratford.
February 2013 in Network Rail and Suppliers
Station and platform
Infrastructure
Security
South East
Concerns have been raised about passengers, particularly youths,
trespassing at Basildon station in order to evade fares. This is
being witnessed on a daily basis, by both staff and other
passengers.
November 2012 in Network Rail and Suppliers
Infrastructure
Work environment
South East
November 2012 in Network Rail and Suppliers
Infrastructure
Level Crossings
Station and platform
Security
South East
November 2012 in Network Rail and Suppliers
Infrastructure
Security
South East
November 2012 in Network Rail and Suppliers
Infrastructure
Security
South East
November 2012 in Network Rail and Suppliers
Infrastructure
Rolling stock
South East
A reporter is concerned that some London Overground (LOROL) Drivers are isolating the tripcocks on trains and then not resetting them.
September 2012 in London Underground
Infrastructure
Knowledge Skills and experience
Equipment
South East