51576 ‘Lone working’ at Chesterfield station

April 2013 in Train Operations

tagged Fatigue Method of working Workload North West

Concerns have been raised about staff lone working at Chesterfield station and the effect this could have on fatigue management and personal safety.

Continue reading this article »

51643 Infrastructure staff working excessive hours

April 2013 in Freight Operations

tagged Fatigue Rostering Rules and procedures South East South West West Midlands East Midlands

A reporter is concerned about excessive hours being worked by staff for the infrastructure side of DB Schenker in the south and Midlands.

Continue reading this article »

51567 Inadequate PNBs at Thames Valley signalling centre

March 2013 in Network Rail and Suppliers

tagged Fatigue Method of working Rostering Central

Concerns have been raised about staff at Thames Valley Signalling Centre (TVSC) not receiving adequate personal needs breaks (PNBs).

Continue reading this article »

51268 ‘Inadequate’ rest period during shift rotation

February 2013 in Network Rail and Suppliers

tagged Fatigue Rules and procedures Not Specified

A reporter is concerned about the rest periods received by Driver Operators when rotating from night to day shifts.

Continue reading this article »

51457 Fatigued workers exceeding 14 hours door-to-door

February 2013 in Network Rail and Suppliers

tagged Fatigue Rules and procedures Supervision and Management Not Specified

A reporter is concerned about the rostering and travel times of Colas staff doing track renewal work in the western region. The reporter states the Network Rail 14 hour door-to-door recommendation is regularly being exceeded and staff are often doing 15 or 16 hours door-to-door.

Continue reading this article »

51121 Ten hour turns with no breaks away from the locomotive

February 2013 in Train Operations

tagged Fatigue Method of working North East

A reporter is concerned that Guards who work the Pickering to Grosmont turn at North Yorkshire Moors Railway are unable to take a Personal Needs Break (PNBs) away from the train on some of the ten hour turns.

Continue reading this article »

51372 Exceedance of the 14 hour door-to-door recommendation

January 2013 in Network Rail and Suppliers

tagged Fatigue Rules and procedures South East

Concerns have been raised about long travel times for KJ Rail staff working on a Balfour Beatty site, resulting in them exceeding Network Rail's 14 hour door-to-door recommendation. This report follows CIRAS reports 50156, 50562 and 50565 sent to KJ Rail in 2011, also concerning long travel times for staff.

Continue reading this article »

51417 ‘Mental fatigue’ created by the intensity of metro driving

January 2013 in Train Operations

tagged Fatigue Rostering Method of working South East

A reporter is concerned that metro Drivers are experiencing 'mental fatigue' as a result of the intensity of the routes in the metro area, coupled with a lack of adequate turnaround times.

Continue reading this article »

50935 Staff double-shifting for various companies

December 2012 in Network Rail and Suppliers

tagged Supervision and Management Fatigue Not Specified

A reporter is concerned that Cleartrack staff are sometimes working for several other companies and are therefore able to conceal the fact that they are double-shifting. Double-shifting is not condoned by Cleartrack, but the reporter suggests they may not be fully aware of the shift patterns of all their staff.

Continue reading this article »

50906 ‘Industry-wide problem’ for subcontractor travel times

November 2012 in Network Rail and Suppliers

tagged Fatigue Rules and procedures Rostering Not Specified

A reporter is concerned that long travel times for subcontractors exceed acceptable levels at many different companies.

Continue reading this article »