December 2012 in Network Rail and Suppliers
Signalling
Method of working
Level Crossings
East Anglia
A reporter is concerned that the introduction of the new signalling system in Greater Anglia will result in level crossing users having to wait longer before being given permission to cross by the Signaller. This could lead to users making high risk decisions to cross without confirmation that it is safe to do so.
November 2012 in Network Rail and Suppliers
Infrastructure
Level Crossings
Station and platform
Security
South East
November 2012 in Network Rail and Suppliers
Rules and procedures
Level Crossings
Not Specified
A reporter seeks clarification on the correct procedure to follow in the event of a barrier failure at a manually controlled level crossing.
July 2012 in Network Rail and Suppliers
Infrastructure
Level Crossings
North East
July 2012 in Network Rail and Suppliers
Knowledge Skills and experience
Level Crossings
Method of working
Not Specified
March 2012 in Network Rail and Suppliers
Rules and procedures
Method of working
Level Crossings
Communication and teamwork
Not Specified
A reporter is seeking clarification on whether Signallers should be adhering toRule Book module TS9 part 2.6. This section applies when Signallers have been informed that the road traffic lights at an Automatic Open Crossing Locally monitored (AOCL) or Automatic Barrier Crossing locally monitored (ABCL) have failed.
February 2011 in Network Rail and Suppliers
Level Crossings
Equipment
Scotland
A reporter is concerned that an audible alarm at Dunkeld signal box, which is for Murthly level crossing, has been out of action for more than six months.
February 2011 in Network Rail and Suppliers
Level Crossings
Equipment
Scotland
An audible alarm at Errol signal box, which is for The Grange level crossing, has been out of action for a couple of months, according to one reporter.
January 2011 in Network Rail and Suppliers
A reporter is concerned about the way level crossing failures at Camberley may be dealt with in the future.
January 2011 in Network Rail and Suppliers
Level Crossings
Rules and procedures
South East
A reporter is concerned about the behaviour of farmers in Kent - and sometimes other members of the public - who are frequently leaving open the gates of many user worked crossings.