
August 2009 in Network Rail and Suppliers
Signalling
Method of working
Equipment
Training and briefing
Level Crossings
Infrastructure
East Midlands
East Anglia
A reporter is concerned that the instructions in Beckingham signal box were not changed after emergency regulation was re-introduced about six months ago.
August 2009 in Network Rail and Suppliers
Level Crossings
Method of working
East Midlands
A reporter is concerned that track workers in the Lincoln area are no longer allowed to park on level crossings to load trolleys with equipment.