51576 ‘Lone working’ at Chesterfield station

April 2013 in Train Operations

tagged Fatigue Method of working Workload North West

Concerns have been raised about staff lone working at Chesterfield station and the effect this could have on fatigue management and personal safety.

Continue reading this article »

51600 Clarification required on procedures at Teesside steel works

April 2013 in Freight Operations

tagged Method of working Rules and procedures Training and briefing North East

Clarification is sought on the correct procedures that should be followed when propelling wagons at Teesside steel works. It has been noted that various methods are being used when propelling rigs of nine and fifteen wagons.

Continue reading this article »

51638 Groundstaff not used at Cliffe Hill quarry

April 2013 in Freight Operations

tagged Method of working Rules and procedures West Midlands

It has been brought to a reporter's attention that GB Railfreight are asking their Drivers at Stud Farm sidings in Cliffe Hill quarry to undertake train duties alone.

Continue reading this article »

51622 GSM-R requirements for Drivers not met in Lincolnshire

April 2013 in Freight Operations

tagged Communication and teamwork Method of working Training and briefing East Midlands

A reporter is concerned that some freight Train Drivers have not adjusted to the new requirements for GSM-R and are not registering their trains when entering service in Lincolnshire.

Continue reading this article »

51509 Extended periods between rail vehicle examination checks

March 2013 in London Underground

tagged Method of working Rolling stock Rules and procedures South East

A reporter is concerned that the time taken between rail vehicle examination checks on London Underground rolling stock has been extended from 14 days to 23 days. There is the possibility this may be further increased to 28 days.

Continue reading this article »

51567 Inadequate PNBs at Thames Valley signalling centre

March 2013 in Network Rail and Suppliers

tagged Fatigue Method of working Rostering Central

Concerns have been raised about staff at Thames Valley Signalling Centre (TVSC) not receiving adequate personal needs breaks (PNBs).

Continue reading this article »

51435 Passengers undertaking ‘unsafe behaviour’ at Newark Castle

March 2013 in Train Operations

tagged Level Crossings Station and platform Method of working East Midlands

A reporter has expressed concern that passengers are crossing when the barriers are down at Newark Castle level crossing in order to catch trains waiting at the station.

Continue reading this article »

51317 ‘Unworkable’ train schedules increasing Signallers’ workload

February 2013 in Network Rail and Suppliers

tagged Communication and teamwork Method of working Workload Not Specified

Concerns have been raised that trains are being scheduled into the working timetable without being validated, potentially increasing the workload for Signallers.

Continue reading this article »

51365 Staff covering roles when ‘not fully competent’

February 2013 in Network Rail and Suppliers

tagged Knowledge Skills and experience Method of working Training and briefing Not Specified

A reporter is concerned that Mobile Operation Managers (MOMs) are being asked to cover for the Shift Signalling Managers (SSMs) in signal boxes, without the required knowledge of the rules and regulations.

Continue reading this article »

51399 Signalling arrangements at Norton Bridge junction

February 2013 in Network Rail and Suppliers

tagged Method of working Signalling West Midlands

Concerns have been raised about the practice of bringing High Speed Trains (HSTs) travelling at 125mph to a stop at signal SC3612 protecting Norton Bridge junction.

Continue reading this article »