Report your concern online
A safety net when all else fails

53632 Unclear monitors at Putney Bridge station

July 2015 in London Underground

tagged Equipment Method of working Station and platform South East

A reporter has raised concerns about unclear monitors on the westbound platform at Putney Bridge station.

Continue reading this article »

53554 Management of door obstructions

July 2015 in London Underground

tagged Communication and teamwork Method of working Rules and procedures Station and platform South East

A reporter is concerned about how London Underground are managing the behaviour of passengers in relation to door obstructions.

Continue reading this article »

53492 and 53493 Rail masters not checked adequately

June 2015 in London Underground

tagged Equipment Method of working Rules and procedures Training and briefing South East

Several reporters have raised concerns about inadequate checks carried out on rail masters.

Continue reading this article »

53390 Unsafe practices relating to asset inspections

May 2015 in London Underground

tagged Infrastructure Method of working Rules and procedures Supervision and Management South East

A reporter is concerned about asset inspections being carried out without the correct equipment or method statements.

Continue reading this article »

53098 Staff entering a live section of track without protection

January 2015 in London Underground

tagged Method of working Rules and procedures South East

A reporter has raised concerns about staff putting themselves at risk by walking onto a live section of track on a site at Roxborough bridge.

Continue reading this article »

53210 Overloading of vehicles at Lillie Bridge depot

December 2014 in London Underground

tagged Equipment Method of working Rules and procedures South East

A reporter has raised concerns that vehicles transporting loads from Lillie Bridge depot may be overloaded.

Continue reading this article »

53116 Correct side door enable equipment failure at East Putney

November 2014 in London Underground

tagged Equipment Infrastructure Method of working Station and platform South East

A reporter is concerned about the Correct Side Door Enable (CSDE) equipment which has failed on the westbound platform at East Putney station. This is just affecting D stock trains on the District line.

Continue reading this article »

52196 Communication issues between Signallers and Controllers

July 2014 in London Underground

tagged Communication and teamwork Method of working Signalling South East

Concerns have been raised about the poor communication between London Underground Signallers and Line Controllers during periods of service disruption on the District line.

Continue reading this article »

52816 Procedure not followed after discovery of potential asbestos

May 2014 in London Underground

tagged Method of working Rules and procedures Supervision and Management Work environment South East

Concerns have been raised that the correct procedure was not followed after the discovery of potential asbestos on a train at Northfields depot.

Continue reading this article »

52657 & 52662 Unqualified staff covering Service Controller duties

April 2014 in London Underground

tagged Knowledge Skills and experience Method of working Rules and procedures Training and briefing South East

Concerns have been raised about Service Controller duties being covered by unlicensed and unqualified staff during strike action on Wednesday 5 and Thursday 6 February 2014. This issue occurred on numerous lines across the Underground.

Continue reading this article »

older Articles