51339 Incorrect set up of speed restrictions in East Anglia

February 2013 in Network Rail and Suppliers

tagged Equipment Knowledge Skills and experience Rules and procedures Supervision and Management East Anglia

Concerns have been raised about the incorrect set up of Automatic Warning System (AWS) cancelling indicators between Colchester and Chelmsford.

Continue reading this article »

50018 Cancelling indicators set up incorrectly

May 2011 in Network Rail and Suppliers

tagged Equipment East Anglia

A reporter has raised concerns about Automatic Warning System (AWS) indicators not being set up correctly between Colchester and Chelmsford. This was last brought to the attention of Network Rail by CIRAS in July 2010.

Continue reading this article »

41146 High intensity lights dazzling Drivers at level crossings

December 2010 in Network Rail and Suppliers

tagged Level Crossings Equipment East Anglia

Areporter is concerned that newly installed, high intensity Light Emitting Diodes (LEDs) at level crossings on the East Suffolk line are dazzling Train Drivers on their approach.

Continue reading this article »

41032 Missing AWS cancelling indicators (Colchester-Chelmsford)

September 2010 in Network Rail and Suppliers

tagged Equipment Infrastructure East Anglia

A reporter is concerned that Automatic Warning System (AWS) cancelling indicators are not being set up correctly as per Rule Book requirements on the stretch of line between Colchester and Chelmsford.

Continue reading this article »

40821 Condition, positioning and use of speed restriction boards

March 2010 in Network Rail and Suppliers

tagged Infrastructure Equipment Method of working East Anglia Central

A reporter has contacted CIRAS with concerns about the condition and positioning of temporary speed restriction (TSR) boards and the use of limited clearance speed restriction boards throughout the Ipswich and Felixstowe areas.

Continue reading this article »

40750 & 40753 Use of flank protection on junctions in the Anglia region

August 2009 in Network Rail and Suppliers

tagged Infrastructure Equipment East Anglia

Concerns have been raised by more than one reporter about possession planning and protection of track workers in the Anglia region.

Continue reading this article »

40725 Lack of clear instructions in Beckingham signal box

August 2009 in Network Rail and Suppliers

tagged Signalling Method of working Equipment Training and briefing Level Crossings Infrastructure East Midlands East Anglia

A reporter is concerned that the instructions in Beckingham signal box were not changed after emergency regulation was re-introduced about six months ago.

Continue reading this article »

40744 Right side failure at Brundall Junction will lead to ‘complacency SPAD’

August 2009 in Network Rail and Suppliers

tagged Infrastructure Equipment Signalling East Midlands East Anglia

A reporter has noted that over the past few weeks there appears to be a right side failure occurring with the distant signal on the approach to Brundall Junction, in the up direction from the Yarmouth branch line and the Lowestoft main line.

Continue reading this article »