53390 Unsafe practices relating to asset inspections

May 2015 in London Underground

tagged Infrastructure Method of working Rules and procedures Supervision and Management South East

A reporter is concerned about asset inspections being carried out without the correct equipment or method statements.

Continue reading this article »

53509 Inadequate welfare facilities at Ruislip depot

May 2015 in London Underground

tagged Work environment South East

A reporter has raised concerns about the lack of welfare facilities on a site at Ruislip depot.

Continue reading this article »

53270 ‘Inadequate’ lighting and CCTV at North Acton

March 2015 in London Underground

tagged Equipment Security Station and platform Work environment South East

A reporter has expressed concern about the inadequate lighting and lack off Closed Circuit
Television (CCTV) at the station entrance and exit at North Acton.

Continue reading this article »

53254 Train vibrations causing back problems

February 2015 in London Underground

tagged Rolling stock Work environment South East

A reporter has contacted CIRAS to express concern that the vibration of the trains on the
Piccadilly line is causing Drivers back problems.

Continue reading this article »

53098 Staff entering a live section of track without protection

January 2015 in London Underground

tagged Method of working Rules and procedures South East

A reporter has raised concerns about staff putting themselves at risk by walking onto a live section of track on a site at Roxborough bridge.

Continue reading this article »

53210 Overloading of vehicles at Lillie Bridge depot

December 2014 in London Underground

tagged Equipment Method of working Rules and procedures South East

A reporter has raised concerns that vehicles transporting loads from Lillie Bridge depot may be overloaded.

Continue reading this article »

53116 Correct side door enable equipment failure at East Putney

November 2014 in London Underground

tagged Equipment Infrastructure Method of working Station and platform South East

A reporter is concerned about the Correct Side Door Enable (CSDE) equipment which has failed on the westbound platform at East Putney station. This is just affecting D stock trains on the District line.

Continue reading this article »

53155 Condition of the mess room at Waterloo

November 2014 in London Underground

tagged Work environment South East

A number of reporters are concerned about the condition of the mess room at Waterloo Underground station.

Continue reading this article »

53032 Inadequate staff at Canary Wharf control centre

October 2014 in London Underground

tagged Fatigue Rostering Workload South East

Concerns have been raised that there are inadequate staff rostered on to respond to calls at Canary Wharf control centre.

Continue reading this article »

53149 Large gap between the train and platform at Baker Street

October 2014 in London Underground

tagged Infrastructure Rolling stock Station and platform South East

A reporter is concerned about the size of the gap between the train and the platform on platforms one and two, at Baker Street station. This affects the northbound Metropolitan line.

Continue reading this article »