Report your concern online
A safety net when all else fails

53632 Unclear monitors at Putney Bridge station

July 2015 in London Underground

tagged Equipment Method of working Station and platform South East

A reporter has raised concerns about unclear monitors on the westbound platform at Putney Bridge station.

Continue reading this article »

53492 and 53493 Rail masters not checked adequately

June 2015 in London Underground

tagged Equipment Method of working Rules and procedures Training and briefing South East

Several reporters have raised concerns about inadequate checks carried out on rail masters.

Continue reading this article »

53270 ‘Inadequate’ lighting and CCTV at North Acton

March 2015 in London Underground

tagged Equipment Security Station and platform Work environment South East

A reporter has expressed concern about the inadequate lighting and lack off Closed Circuit
Television (CCTV) at the station entrance and exit at North Acton.

Continue reading this article »

53210 Overloading of vehicles at Lillie Bridge depot

December 2014 in London Underground

tagged Equipment Method of working Rules and procedures South East

A reporter has raised concerns that vehicles transporting loads from Lillie Bridge depot may be overloaded.

Continue reading this article »

53116 Correct side door enable equipment failure at East Putney

November 2014 in London Underground

tagged Equipment Infrastructure Method of working Station and platform South East

A reporter is concerned about the Correct Side Door Enable (CSDE) equipment which has failed on the westbound platform at East Putney station. This is just affecting D stock trains on the District line.

Continue reading this article »

53059 Cameras not displaying platform-train interface at Tower Hill

August 2014 in London Underground

tagged Equipment Station and platform South East

Concerns have been raised that the cameras on the eastbound platform at Tower Hill are not
displaying the full length of the Platform-Train Interface (PTI).

Continue reading this article »

52757 Reoccurring CCTV image faults on the Central line

April 2014 in London Underground

tagged Equipment Rolling stock Rules and procedures Station and platform South East

Train Operators on the Central line are concerned about faults with the One Person Operations (OPO) CCTV equipment. This issue was previously raised as CIRAS report 50458 in December 2011.

 

Continue reading this article »

52492 Lack of a failsafe system on road seven at Waterloo depot

March 2014 in London Underground

tagged Equipment Infrastructure Method of working South East

Concerns have been raised about the lack of a failsafe system on road seven at Waterloo depot on the Waterloo & City line.

Continue reading this article »

52569 Inadequate lighting in Waterloo and City depot

March 2014 in London Underground

tagged Equipment Work environment South East

Concerns have been raised about inadequate lighting on roads five and six in the Waterloo and City depot.

Continue reading this article »

52240 No extraction system for works at Morden depot

December 2013 in London Underground

tagged Equipment Method of working Work environment South East

Concerns have been raised about the lack of a fume/dust extraction system at Morden depot.

Continue reading this article »

older Articles