Find out more about the reports we have closed in November and December 2020. The table includes the report number, brief description and sector.

CIRAS members can read the full reports and member responses by signing into the members' portal.

Report no. Title Sector(s)
02271 Communication issues when arranging T3 Possessions Infrastructure Managers
02573 Concern regarding inadequate trespass prevention measures at Whittingehame Drive, Glasgow Infrastructure Managers
02604 Concern about the removal of letter prefixes from references to points on the Anglia Route in the Weekly Operating Notice Infrastructure Managers
02586 Concern over the priority given to repair a faulty signal at Claberston Road, Wales Infrastructure Managers
02542 Concern regarding vegetation at Lichfield Trent Valley down sidings Infrastructure Managers
02621 Concern regarding mitigations to prevent spread of Covid-19 at Stratford Market Depot LU
02662 Concern over inadequate Covid-19 procedures at Golders Green Depot LU
02555 Concern over the assessment and monitoring of trackworker competency Supply chain
02666 Concern over returning to office policy Supply chain
02639 Concern over inadequate fatigue planning for night shifts Supply chain
02583 Concern over staff safety at stations between Woodhall and Gourock/Wemyss Bay TOC
02654 Concern over staffing levels at Bournemouth Train Care Depot TOC
02641 Multiple safety concerns about safe walking routes at Bournemouth Train Care Depot TOC
02605 Concern over protocols for mitigating the transmission of Covid-19 at Glasgow Central Station TOC
02619 Concern over the continuity of on-board duties during Covid-19 pandemic TOC
02590 Lack of information and safety measures on Driver Only services TOC
02547 Safety concern about the suitability of derailers for High-Speed Trains (HSTs) TOC
02565 Concern regarding the fitness of station staff to perform safety critical duties Urban Rail


Key:
TOC - Train Operating Company    LU - London Underground